Project Overview
Armutlu which is in the province of Yalova, is located on the coast of Sea of Marmara. Project scope was construction of the open-sea wastewater discharge line of Armutlu.
A barge-mounted clamshell was utilized for underwater excavation and backfilling in this project A total of 1,200 meters of pipe is laid underwater; 350 meters of which is buried and the rest is exposed, tied to concrete submerging blocks underwater.
Client: Bank of Provinces
Final Completion: 2004
- 1,200 m. 450 HDPE pipe (underwater)
- 213 R.C. blocks
- 6,300 concrete bags